Set the driveway area
Enter the overall length and width, then give each active layer its own depth. Refresh projects can start with only a new surface layer.
PROJECT PLANNER
Estimate how much gravel you need for a driveway by layer. Set the footprint, build a sub-base, base and surface plan, adjust material density and pricing, and calculate cubic yards, tons, truckloads and optional material cost.
Layer depths are editable examples, not structural recommendations. Soil, drainage, traffic loads and local specifications can change the required design.
IMPORTED FROM PROJECT BUILDER
Selected Project Builder geometry is ready to plan.
The imported surface is loaded as the Surface course only. Add base or sub-base layers if your driveway design requires them.
QUICK PLANNING GUIDE
Plan a gravel driveway as separate sub-base, base and surface layers instead of treating the whole build-up as one material quantity.
Enter the overall length and width, then give each active layer its own depth. Refresh projects can start with only a new surface layer.
MetricSketch keeps layer volume, weight, cost and estimated truckloads separate, then combines them into a supplier-ready project summary.
Layer thickness and material choice depend on soil, drainage, traffic, climate and local requirements. Enter the design or supplier values appropriate to the site.
PROJECT SETUP
Example setup: sub-base, base and surface layers. Adjust every depth for your actual project.
DELIVERY PLANNING
Use an editable planning payload to estimate how many separate loads each material layer may require.
Leave blank to hide load estimates.
LAYERS
Set a layer depth to 0 to leave that layer out of the project.
Densities are editable planning values. If your supplier provides a product-specific bulk density, use that value instead.
PROJECT OUTPUT
Use the sequence as a planning checklist and the supplier summary as a concise handoff when requesting material pricing or delivery.
This is a planning sequence, not a structural specification. Actual preparation, drainage, compaction and layer requirements depend on the site and project.
Confirm dimensions, drainage direction and finished level before placing aggregate.
Large aggregate · 6 in
Compact in suitable lifts according to the project and equipment being used.
Crusher run · 4 in
Re-check grade and levels before the surface course.
General gravel · 2 in
Confirm finished surface, edges and drainage before closing out the project.
Prices and truckloads are planning estimates. Confirm product density, payload limits, availability and final pricing with the supplier.
GRAVEL DRIVEWAY PLANNING GUIDE
A gravel driveway estimate is more useful when each material stays separate. MetricSketch applies the same footprint to every active layer, then converts each layer into order volume, estimated tons or tonnes, optional material cost and delivery-load estimates.
Enter the driveway length and width in US or metric units. The same footprint is used for every active layer in the plan.
Keep sub-base, base and surface materials separate. Set a depth to zero when a layer is not part of your project.
Add an ordering allowance, optional prices and a truck payload to produce a shopping list and supplier-ready material summary.
UNDERSTANDING THE LAYERS
The lower aggregate course in a layered plan. Material and depth are editable because site conditions and project specifications vary.
The intermediate aggregate course. MetricSketch keeps its quantity, density, price and estimated loads separate from the other layers.
The upper material course. A refresh project can use only this layer, while a new driveway can include all three.
Layer depths in the planner are editable examples, not engineering recommendations. Soil, drainage, traffic loads, climate and local requirements can change the appropriate driveway design.
WORKED EXAMPLE
The default example has a 720 ft² footprint with 6 in of sub-base, 4 in of base and 2 in of surface material. With a 10% ordering allowance, the three layers total about 29.33 yd³ and approximately 46.20 US tons using the example densities in the planner.
With the default 20 US ton payload, those example materials require four planned loads because each layer is treated as a separate material order. Confirm actual product density, load limits and driveway design with your supplier or project specification.
DRIVEWAY PLANNER FAQ
Enter the driveway length and width, then set a depth for each active layer. MetricSketch calculates cubic yards or cubic meters, estimated tons or tonnes, optional cost and truckloads for each material before combining them into a project total.
Yes. Choose Refresh existing to start with only the surface layer active. You can add base or sub-base again by entering a depth greater than zero.
The planner converts each layer's volume to estimated weight using its material density. Enter a planning payload per load and MetricSketch divides each layer weight by that payload and rounds up, keeping different materials as separate delivery estimates.
The planner does not prescribe a structural depth. Use the requirements for your site, design or supplier, then enter those depths to estimate quantities.
The extra-material percentage adds an ordering allowance above the calculated compacted volume. Set it to zero when you only want the geometric quantity.
No. They are planning estimates. Confirm the product density, delivery units, availability, final quantity and current pricing with your supplier before purchasing.
QUICK PROJECT GUIDE
Use one driveway footprint to estimate sub-base, base and surface quantities, convert them to tons or tonnes, plan truckloads and keep layer costs together.