Choose the pour
Use slab, footing or post-hole geometry, or start from a known area or volume. Multiple pours can be combined into one temporary project total.
CONSTRUCTION CALCULATOR
Estimate how much concrete you need in cubic yards or cubic meters for slabs, pads, rectangular footings and post holes. Combine multiple pours, compare ready-mix with 40 lb, 60 lb and 80 lb bags, add an ordering allowance and estimate material cost before you buy.
IMPORTED FROM PROJECT BUILDER
Concrete geometry from Project Builder is ready to calculate.
QUICK PLANNING GUIDE
Choose the shape that matches the pour, enter the measurements you already have and compare the resulting order volume with ready-mix or whole-bag quantities.
Use slab, footing or post-hole geometry, or start from a known area or volume. Multiple pours can be combined into one temporary project total.
MetricSketch calculates cubic yards and cubic meters, applies your chosen extra allowance and shows ready-mix volume plus 40 lb, 60 lb and 80 lb bag references.
Verify the required mix, actual bag yield, minimum ready-mix delivery, short-load fees and the dimensions of the finished forms or excavation.
SLAB / PAD
Use slab mode when you know the length, width and thickness of a rectangular pour.
Concrete including the selected extra-material allowance.
MULTIPLE POURS
Add the current calculation to a temporary project list, then mix slabs, footings, post holes, known areas and known volumes into one combined total. The selected extra percentage is applied once to the combined base volume.
No pours added yet. Calculate a slab, footing, post-hole group or known quantity above, then add it here.
PURCHASE PLANNING
Turn either the current calculation or your combined project total into a purchase quantity. Use ready-mix for a volume-based quote or compare standard 40 lb, 60 lb and 80 lb bags for smaller jobs.
Enter a supplier price only if you have one. Unit switching converts the price basis so the estimated total stays the same.
Bag counts always round up to whole bags. Yield values are planning estimates; confirm the product label before buying.
PROJECT OUTPUT
A compact view of the calculation currently feeding Purchase Planning. Copy it to your notes or print the clean summary to save it as a PDF for a supplier quote or project record.
Planning estimate only. Confirm mix specification, minimum delivery, short-load fees, bag yield and supplier requirements before ordering.
CALCULATION METHOD
MetricSketch converts the geometry you know into a base concrete volume, then applies the selected extra-material allowance to produce an order quantity. Slab and footing modes use rectangular volume, post-hole mode uses cylindrical volume, and known-area or known-volume modes let you start further along the calculation.
FIVE INPUT PATHS
Rectangular slabs, pads and patios. Quantity can represent several identical pours.
Continuous or repeated rectangular footings using length, width, depth and quantity.
Cylindrical holes using diameter, depth and number of holes.
Square footage or square meters plus the concrete thickness.
A cubic-yard or cubic-meter figure that only needs an ordering allowance.
WORKED EXAMPLE
A slab measuring 10 ft by 10 ft at 4 in thick has a base volume of about 1.23 yd³. With a 10% extra-material allowance, the order quantity becomes about 1.36 yd³. Use the purchase planner above to compare that volume with ready-mix pricing or whole-bag alternatives.
Concrete ordering requirements vary by supplier. Confirm minimum loads, short-load fees, mix specification and actual bag yield before purchasing.
CONCRETE CALCULATOR FAQ
These answers explain the quantities shown by the calculator and when supplier information should replace a planning assumption.
Calculate the volume of the pour from its dimensions, then convert that volume into cubic yards or cubic meters. MetricSketch handles the conversions and can add an extra-material percentage to the base quantity.
For a rectangular slab, multiply length by width by thickness and convert the result to cubic yards. In US units, thickness is commonly entered in inches while length and width are entered in feet.
Bag count depends on the concrete volume required and the yield of the bag size. The purchase planner compares whole 40 lb, 60 lb and 80 lb bag counts using planning yields; always confirm the actual product label before buying.
Yes. Footing mode uses rectangular length, width and depth, while post-hole mode uses hole diameter, depth and quantity for cylindrical pours.
The correct allowance depends on the project, formwork, excavation accuracy and supplier requirements. MetricSketch lets you choose the percentage instead of applying a fixed recommendation.
Ready-mix is ordered by volume, while bagged concrete is purchased in whole bags. The calculator shows both approaches so you can compare quantities and optional supplier prices for your project.
QUICK PROJECT GUIDE
Use the same concrete calculator for cubic yards or cubic meters, ready-mix planning, bag quantities, waste allowance and optional material cost.